Monday 7 December 2015

last week of rehearsals

It's rather a shame that, having been so busy with the play over the last 2 weeks, I haven't had time to blog about it. As now I have to update everything after it's happened. But that's how it is, so it can't be helped.

Needless to say, the last 2 weeks of rehearsals flew by. From 22 November we had the theatre to ourselves so the set went up and slowly Belinda's house took shape before our very eyes. Richard is very clever and not only designed the set but built it too, and a few of us helped paint the walls and some bits and pieces on the Thursday. That was all good fun, knowing that we were helping to bring it all together. I feel Pattie and Belinda might have been the sorts who got on with the decorating rather than relying on Neville and Eddie. Richard can certainly be relied on though and decked out the whole house with cards and decorations, which I got in Poundland, and it looked fabulous.

Sunday before the performance week was our tech/dress rehearsal, so we were there a good few hours as the sounds and lighting were fitted to the play. It meant running through a few scenes a few times so we were all exhausted by the time we went home. Monday night was full dress rehearsal and Tuesday too. Something odd happened on Tuesday and I just gave the worse performance ever, forgetting whole lines, and getting in a muddle. But luckily that was still a practice and before the real thing.

We had all our things in the dressing rooms and green room and so the props and back stage crew were busy getting everything in place for us. They were very reliable and had a lot of props to deal with including bowls of mousse, jelly and plates of sandwiches.  The stage manager, Lindsay, was very calm and that really helped us be calm too.

No comments:

Post a Comment